Building connection construction method - メーカー・企業と製品の一覧 | イプロス

Building connection construction methodの製品一覧

1~1 件を表示 / 全 1 件

表示件数

Connection Method

Connecting buildings that were separated! You can make effective use of dead space within the site.

The "Connection Construction Method" involves constructing a new building (or an extension) that aligns with the floor level of two existing buildings that are separated by a gap, thereby integrating (linking) the previously disconnected structures. This method allows for the effective use of dead space within the site, enabling operations to continue without being affected by weather conditions when moving between factories. Furthermore, the creation of new pathways in what were originally separate buildings can lead to improvements in productivity and smoother production lines. 【Features】 ■ Integration (linking) of previously disconnected buildings ■ Effective use of dead space within the site ■ Operations can continue without being affected by weather conditions when moving between factories ■ Potential for improvements in productivity and smoother production lines *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • others
  • Building connection construction method

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Building connection construction methodの関連カテゴリ